35 MW green data centre to be ready for service in Q1 2028.
Tokyo
location
35 MW
power capacity
21,000 sqm
colocation space
Tokyo
location
35 MW
power capacity
21,000 sqm
colocation space
Excellent fibre connectivity within 5km from Otemachi, the Internet Exchange and Tokyo CBD, offering carrier-neutrality and low latency access to applications and end users.
Green building design with advanced cooling solutions to reduce water and energy usage.
Built to host high-performance computing and GPU servers, with the cooling and power systems to match.
Deploy with us throughout
our footprint in Asia with assurance of consistent, connected and secure operating standards
Scale your Growth in Asia with
Empyrion Digital’s Next-Generation
Digital Infrastructure
Deploy critical infrastructure with confidence – Our data centres are certified to meet local regulatory requirements and rigorous environmental and energy management standards